Battery Capacity Dividing |
|
Prompts specially:
1. On this test system electrode (short electrode) is a positive electrode, gets down electrode (to be expandable) is   the cathode.
2. When test clearly recognized the battery cathode, does not have to meet with the measuring head instead;
3. Tests electrode to have to be good with the battery contact, must clamp the battery,(clamps the degree is: The
cathode is compressed 2-3mm then);
4. Installs after when the battery should use the battery cathode to press first cathode contacts again the positive
electrode! 5. When takes the battery, should not pull out the battery directly, in order to avoid the damage measuring head,
should compress the cathode head first, lets the battery positi ve electrode and positive electrode escapes To after, then takes down the battery!
6. This system examination flow is five labor steps, cannot increase, the fifth labor step after the sufficient electrician
step (for electric discharge battery supplemented electric quantity) this labor step only might establish the
magnitude of current (only to carry out constant flow charge) the time is 100 minutes, the voltage is 4.2V, the time
value and the voltage value already establishes by the procedure, could not change, when tested other low voltage
batteries had the artificial control its duration of charging. This labor step when charge only demonstrated the
battery the real-time voltage and the magnitude of current, did not demonstrate supplemented capacity. Like only
needs two labor step to carry on the test, then from third step starts to move, from when third step starts the
movement, the first two labor step are automatically withdrawn from,does not participate in the work, but still
demonstrated when the flow sheet),the hypo thesis time system automatic knock off, like only needs a labor step
carries on the test,then from fourth step starts to move, after the hypothesis time movement finished the system
automatic knock off.
7. Must carry on the capacity test and the minute allows to work, suggested last the labor step establishes in the flow
establishment for puts the electrician step, because discharges measured to the capacity parameter is the battery
true capacity parameter, when the charge examines to the capacity is not worth taking the battery the true
capacity. (Electric discharge tests to capacity senate value is most real)!
Exception Handle :
1. If the LCD isn’t displaying or shining, be sure the power supply on and the fuse tube fixed.
2. Please check whether the battery is properly settled, eligible (damaged) or shed of downlead of the pole if no voltage
or current in some channel.
3. The red indicator in some channel doesn’t work. Check the indicator. If damaged, replace it with the same model.
4. Please contact us with any questions or technical support needs.
|
|