plate short-circuits meter |
|
Principle of work : The pole plate short-circuits the reflectoscope reflector is penetrates the principle according to the high pressure,
implements to the accumulator cell pole plate micro short-circuits the test, by leaks the electric current the size judgment
pole plate to short-circuit the degree. Use scope:
Suits micro short-circuits the test in the battery plate and the strong electricity system security pressure resistance, the
insulation and the leakage electric current test.At the same time also is the scientific research laboratory, the
engineering supervision department may not the few pressure resistance, the insulation examination test equipment. Main characteristic:
This instrument uses the microcomputer digital circuit control, each kind of parameter establishment is the digitization,
direct-viewing is accurate. The test work both can manual, and energy Automatic, voltage and leakage electric current
real time display, thus may monitor is measured the body the leakage electric current actual value.
Use matters needing attention: 1.When operation must wear under the rubber insulation glove, the chair and the foot the pad good rubber insulating
mat! Only then is testing the lamp to extinguish, does not have the high-pressured output shape When condition,
can carry on is measured the object the connection or the disassemblage operation.
2.The instrument must reliably earth, and with is measured the object the place reliable docking.
3.In the connection was measured when object, must guarantee the output voltage is "O" and repositions the
"condition in".
4.Will be sure not to output the grounding and the alternating current supply short-circuits, in order to avoid the outer
covering will have the high pressure, will create the danger.
5.Avoids the high-pressured out-port and the place short-circuits, by guards against has the accident.
6.Tests the lamp, the newspaper warning light, once damages, must replace immediately,by guards against creates
wrongs call.
7.The instrument avoids the sunlight positive perpendicular incidence, do not have in the high temperature, to be
moist, in the multi- dust environment uses and deposits.
8.After an instrumentation year, after must defer to the country engineering supervision department demand to deliver
the measurement department or to return to the factory examination to be qualified, only then continues to use.
9.Please use exchanges the voltage-stabilized source.
10.Uses the test automation namely automatic start, pays attention to the operational safety by all means must, after
guards against the instrument automatic start the high pressure, namely test time to gap The time (0-9) the second
instrument automatic start, presses repositions the key, the test automation stops. Please note the operational
safety.
11.When user survey capacitor pressure resistance, avoids capacitor many parallel at the same time measuring the
pressure resistance. Or exerts the voltage suddenly, in order to avoid damages the machine. |
|